Page 1 of 1

The price of land at the end of the extension train rose. The Pink Line, Khae Rai - Min Buri, max.

Posted: Fri Nov 20, 2020 12:05 am
by limited
Image



The reporter reported that the real estate information center. The Government Housing Bank (GHB) reported the pre-development land price index in Bangkok and its vicinity in the third quarter of 2020 found that the index was 310.7 points, an increase of 0.7%, an increase at a slower rate compared to the previous quarter. The index is 308.6 points and is up 21.1% compared to the same period last year. Which has an index of 256.5 points. The price of land before development in this quarter. Most of the increased locations remain at the ends of the extension lines and are planned for future construction.



The location where the sky train passes through and has the highest rate of land price expansion. Compared to the same period last year, the top 5 most of them were locations with electric train lines under construction and planned for future construction, namely: 1. Pink Line (Khae Rai - Min Buri), under construction, land price increased. 35.7% compared to the previous quarter. 2. Northern Green Line (Khu Khot - Lam Luk Ka) โปรโมชั่น SLOTXO has not started construction. Land prices have increased 34.2%. The location used to have the highest rate of land price increase for five consecutive quarters and began to slow down this quarter. 3. Blue line (Bang Khae - Phutthamonthon Sai 4) is a project that plans to build in the future. Land prices increased 28.5% 4. Light red line. (Taling Chan - Salaya) plans to build in the future Land price increased by 3.2% 5. The gray line (Watcharaphon - Rama 9 - Thapra) is a project with construction plans in the future. There is a 14.8% increase in land price expansion.



However, when considering the location where the land price increased the highest compared to the previous quarter. Most of them are locations that are already open for service and are under construction, including 1. Dark red line increased 3.8% 2.MRT increased 3.7% 3. Orange line (Cultural Center - Min Buri) was under construction 3.6% 4. Airport link increased 3.2% 5.BTS Sukhumvit line Sky train That are open for service Land price increases by 3.1%.